Home AISIN GHP EC POWER cFos eMobility
Solutions ▾
Experience About Us Contact Members
For energy managers, architects, facility and public-sector managers

Regulation, Incentives and Green Certification Guide

The obligation, grant, financing and certification framework in Turkey for GHP (gas heat pump), micro-cogeneration and EV charging infrastructure projects — on one page, with sources. Current as of October 2026.

Law 5627 (EVK)VAP · EKACircular 2023/15YeS-TR · LEED · BREEAMTSKB · TKYB · JBIC · GEFF

1. Energy Efficiency Law: who must do what?

Energy manager thresholds

Based on average consumption over the last 3 years or on floor area: industry ≥1,000 TOE; commercial and service buildings (hotels, hospitals, shopping centres, private universities) ≥500 TOE or ≥20,000 m²; public buildings ≥250 TOE or ≥10,000 m².

ISO 50001 requirement

With the September 2024 regulation amendment, facilities above the threshold must hold a TÜRKAK-accredited TS EN ISO 50001 Energy Management System certificate. The administrative fine for non-compliance is 516,882 TL in 2025.

Energy audit

Buildings every 7 years and industry every 4 years must commission an audit from an authorised Energy Efficiency Consultancy (EVD) firm; a VAP application requires an EVD audit. Duru Engineering prepares the audit and project file together with its EVD partners.

Our contribution

Feasibility, savings and emission calculations for the GHP/CHP conversion feed directly into the ENVER report and the audit.

2. Grants: VAP and EKA

VAP — Efficiency-Enhancing Project

Grant of up to 30% of project cost; cap for 2026 ~27.1 million TL (annual revaluation). Applications via EVDES (e-Government). Eligible applicants: industrial facilities and commercial/service buildings (including hotels and hospitals) obliged to appoint an energy manager, and ESCOs; implementation period 2 years.

Cogeneration condition

Cogeneration projects require a Cogeneration Plant Efficiency Certificate from ETKB (Ministry of Energy and Natural Resources); micro-cogeneration ≤100 kWe (EC POWER XRGI 6–20) is exempt from licensing and company-formation requirements.

EKA — Energy and Carbon Reduction

Replaces the former voluntary agreement: grant of 30% of annual energy expenditure, capped at ~18 million TL in 2026; each year the 10 industrial and 10 building/service enterprises that reduce carbon intensity the most are selected (2026 applications 1 July–30 September; preparation for the 2027 round should start now).

Public administrations

Public administrations within general government cannot apply for VAP; for public buildings the route is the energy performance contracting (EPS/ESCO) model.

3. Public buildings: 30% by 2030

Presidential Circular 2023/15

At least 30% energy savings by 2030 in public buildings obliged to appoint an energy manager; monitoring and reporting to the Presidency via ETKB (Savings Target and Implementation Guide for Public Buildings 2024–2030).

YeS-TR requirement

With the amendment to the Planned Areas Zoning Regulation (March 2025), the National Green Certificate (YeS-TR) is mandatory from 1 January 2026 for new public health, education, dormitory and service buildings of 10,000 m² and above.

2nd NEEAP 2024–2030

National target: a 16% reduction in primary energy consumption and 100 million tonnes of CO₂ reduction by 2030; buildings and services form a separate action heading.

Our contribution

For municipal and public buildings: ~90% reduction in electrical load with GHP, hot water from waste heat and J-MRV-compliant emission calculation; feasibility suited to the EPS/ESCO model.

4. Green building certificates: which credits do our products contribute to?

Certificate scores are calculated for the building as a whole; below are the credits our products contribute to, together with the honest limitations.

YeS-TR (ÇŞİDB — Ministry of Environment, Urbanisation and Climate Change)

Grades: Pass ≥32, Good ≥40, Very Good ≥55, National Excellence ≥75 weighted points. EKV 01 Building Energy Performance (the highest-weighted module for hotels/health/education): GHP and cogeneration raise the score by lowering primary energy and CO₂; a minimum class B Energy Performance Certificate is required. EKV 02 Renewable Energy: GHP/CHP do not count; PV + cFos "charging with PV surplus" does.

LEED v4.1 BD+C

EA Optimize Energy Performance (18 points): GHP and CHP count as savings in the energy model (ASHRAE 90.1). EA Enhanced Commissioning (6): commissioning and monitoring of GHP/CHP/EVSE. LT Electric Vehicles (1): Level 2 charging responsive to tariff signals at 5% of parking spaces (min. 2) — cFos-compatible. EA Renewable Energy: PV only.

LEED v5 BD+C (2025) — important limitation

EA Enhanced Energy Efficiency (10) is achievable; EA Grid Interactive (2) maps directly onto cFos dynamic load management; LT Electric Vehicles 2 points. However, the new EA Electrification credit (5) is closed to gas-fired GHP and CHP, and full electrification is required for Platinum — a project including GHP/CHP can target at most Gold under LEED v5. We assess this explicitly at the start of the project.

BREEAM International NC

Ene 01 Reduction of energy use and carbon emissions (2016: 15, V6: 13+5 points): GHP+CHP improve the primary energy and CO₂ ratio. Ene 04 Low carbon design (3): the LZC feasibility study in the 2016 version explicitly covers CHP; the credit is awarded if the CHP design lowers CO₂ against the baseline. Tra 03 (2): EV charging at ≥3% of parking capacity. Hea 04 Thermal comfort: GHP-VRF zonal control.

5. Green finance: let the savings pay for the investment

JBIC lines — TSKB and TKYB

The Japan Bank for International Cooperation's green credit lines are extended in Turkey through TSKB (GREEN 4, 350 million USD, June 2026) and the Development and Investment Bank of Turkey, TKYB (5th line, 350 million USD, June 2026, 12-year tenor; energy efficiency explicitly in scope). Projects featuring Japanese technology (AISIN) are natural candidates for these lines.

Other lines

TSKB–KfW 250 million EUR (including energy efficiency, December 2025); TKYB–World Bank ~630 million USD (September 2026); EBRD GEFF Türkiye III (1 billion EUR, 13 partner banks; energy efficiency and tourism included).

Application file

We support the preparation of the application file with feasibility, debt service coverage (DSCR) analysis, sensitivity scenarios and J-MRV-compliant emission calculation. Eligibility is assessed by the bank according to the credit line and the project.

6. COP31 and the Climate Law: timing

COP31 — Antalya, November 2026

Hosting the climate summit makes the emission performance of hotels and public buildings visible; MRV-documented reductions (~62 t CO₂/year for a representative 300-room hotel) feed into Sustainable Tourism Programme certification and corporate reporting.

Climate Law and Emissions Trading System

Emission monitoring and reporting obligations for large facilities are being phased in; a GHP/CHP conversion made today is recorded as a verified reduction in future reporting periods. The timeline and thresholds will be clarified by the implementing secondary legislation.

Let us assess your obligations and incentive eligibility together

Send us your building type, enclosed floor area and the last 12 months of bills; we will work out together which obligations apply to you and which grant/credit lines you are eligible for.

Contact form →

Members only: the guide as PDF and sample feasibility reports

Register free to download the PDF version of this guide, the sample GHP feasibility reports for hotels and residences and our brochures. Only e-mail verification is required.

Go to the member area →

Sources

  1. Regulation on Increasing Efficiency in the Use of Energy Resources and Energy (last amended OG 21.09.2024/32669)
  2. ETKB (Ministry of Energy) — VAP Implementation Procedures and Principles (27.11.2024)
  3. ETKB — Energy and Carbon Reduction (EKA) Support Programme
  4. Presidential Circular 2023/15 — Energy Savings in Public Buildings (OG 04.11.2023)
  5. ÇŞİDB (Ministry of Environment) — Green Certificate Implementation Guide for Public Buildings (March 2026)
  6. ÇŞİDB — YeS-TR Assessment Guide
  7. LEED v5 BD+C summary (CaGBC)
  8. BREEAM International NC V6 — Ene 01
  9. JBIC — TKYB loan agreement (24.06.2026)
  10. TSKB–JBIC GREEN 4 (13.06.2026)
  11. EBRD GEFF Türkiye
  12. Regulation on Unlicensed Electricity Generation in the Electricity Market (last amended 02.04.2026)

This page is for information purposes; legislation and support conditions may change. Contact us for a project-specific assessment of obligations and eligibility.