Toyota AISIN gas heat pumps that cool and heat on natural gas, EC POWER cogeneration that generates electricity on site, and smart cFos Charging Management that enables charging from rooftop and balcony PV. One point of contact from feasibility to TSKB–JBIC green financing, from installation to the annual emissions report.
Manufactured in Japan by AISIN, a Toyota company: air-conditioning units driven by a gas-engine compressor, providing heating, cooling and hot water.
Learn More
Danish-made, high-efficiency micro-CHP units generating power and heat simultaneously in the 6–20 kWe range, with 96% overall efficiency and A+++ energy rating.
Learn More
A complete EV-charging infrastructure: wallbox chargers, dynamic load management and central charging management systems.
Learn MoreSend your last 12 months of electricity and gas bills; let's work out the preliminary savings estimate together.
Full year-round, hot water 24/7, transformer at its limit at the summer peak. GHP takes HVAC off electricity; waste heat warms domestic water. Freed capacity goes to EV charging in the guest car park.
See the solution → Compact GHPA single 16–30 HP unit that can be installed at small scale too; one system instead of boiler plus air conditioning, installed off-season in 2–3 weeks. A measurable contribution to the sustainable-tourism certificate.
See the solution → CHP + GHPEC POWER cogeneration for uninterrupted electricity and hot water: electricity + heat from one fuel, less load on generators. GHP moves the HVAC load to natural gas.
See the solution → Central GHPCentral GHP for dormitories, sports halls, pools and lecture blocks; high hot-water consumption covered by waste heat. Scalable charging infrastructure in the campus car park with cFos.
See the solution → Energy efficiencyMeasurable CO₂ reduction for energy-efficiency obligations and public tenders: feasibility, J-MRV-compliant emissions calculation, TSKB–JBIC green financing file.
See the solution → CHP + pool heatingA constant year-round hot-water load for pool water, showers and HVAC: EC POWER cogeneration generates electricity on site, waste heat warms the pool; GHP moves cooling to natural gas. An ideal profile for municipal and university facilities.
See the solution → Central systemCentral heating-cooling is the largest line in the service charge. GHP means lower charges, no capacity loss in winter and a fair heat-cost-allocator infrastructure; we prepare the presentation for the owners' board.
See the solution → At project stageGHP enters the project before sales: transformer allocation cost falls, a "low-service-charge building" sales argument emerges, and scalable EV charging infrastructure is built into the car park from the start.
See the solution → Reversible interventionHVAC without touching the facade or roof: a few outdoor units hidden in the courtyard/plant area, small-diameter piping, no ducts — a reversible intervention. Electrical load falls by 90% on old, limited transformers; we include the Conservation Board approval process in the project.
See the solution →Hosting COP31 makes the emissions performance of hotels and public buildings visible. GHP and cogeneration conversions deliver greenhouse-gas reductions documented with the international measurement-reporting-verification (MRV) approach: ~62 t CO₂ a year for a representative 300-room hotel. Direct input for Sustainable Tourism Programme certification, public energy-efficiency targets and green-finance applications.
We speak from inside Turkey's energy-efficiency framework: data ready for your energy manager's report, your VAP application, your YeS-TR file and your green-loan application.
Commercial buildings (hotels, hospitals, shopping centres) at ≥500 TOE or ≥20,000 m² and public buildings at ≥250 TOE / ≥10,000 m² must appoint an energy manager and set up ISO 50001; an energy audit every 7 years. A GHP/CHP conversion is a measurable efficiency-enhancing project in your ENVER report.
Efficiency-Enhancing Project (VAP) support — 2026 cap ~27 million TL; hotels and hospitals are eligible, and cogeneration requires an Efficiency Certificate. Together with our EVD (authorised energy-efficiency consultancy) partners we prepare the audit and the application file.
Presidential Circular 2023/15 sets a target of at least 30% savings in public buildings by 2030; from 2026, the YeS-TR certificate (Turkey's national green building certificate) is mandatory for new public health, education and service buildings of ≥10,000 m².
JBIC green credit lines via TSKB and TKYB (development banks; 350 million USD each in 2026, energy efficiency in scope); EBRD GEFF III partner banks. We support the preparation of the application file.
We support your feasibility studies with capacity, COP, tariff and sensitivity assumptions.
AISIN and EC POWER model selection, technical tables, sound data and layout plan; documents that enter the project in specification language.
Outdoor-unit placement, hydraulic schematic, indoor-unit types (cassette, duct, concealed ceiling) and EV charging infrastructure worked into the car-park design.
For estate, building and facility managers: savings table per unit, presentation for the owners' board / management board, maintenance and heat-cost-allocator reading support — let the numbers make the decision, not you.
GHP payback and CHP estimated savings calculators are open on the site; get the preliminary figure yourself, we prepare the definitive feasibility.
Last 12 months of bills + facility data → free preliminary savings estimate.
Capacity assessment, model selection, sensitivity analysis.
Project preparation support for the TSKB–JBIC green loan application; let the savings repay the investment.
Installation on request; otherwise supervision services.
Long-term maintenance contract, annual savings and emissions report.
For your hotel, hospital, campus or public building, the last 12 months of electricity and gas bills plus the drawings are enough.