
Dormitory blocks, sports hall, swimming pool, dining hall and lecture halls: a campus carries a high hot water load all year round and a seasonal air-conditioning load. The gas heat pump made by Aisin, a Toyota Group company, meets this load with a natural gas engine instead of electricity and produces the dormitories' hot water from the engine's waste heat. Several outdoor units operate as a single system in multi-combination up to 160 kW; it is well suited to a phased, block-by-block conversion.
Duru Engineering prepares the feasibility study for the campus energy manager, the YeS-TR points contribution analysis (mandatory for new public education buildings) and the finance file through the revolving fund or foundation.
The morning and evening hot water peak of the dormitory blocks is largely covered by the GHP's waste heat recovery; the boiler's gas consumption shrinks.
First the dormitory block or the sports facility, then the lecture halls: each block is installed as a separate GHP group; the investment is spread over the years and the existing boiler remains on standby.
The cooling peak during summer school and exam periods comes off the transformer; the capacity freed up becomes a reserve for new loads such as laboratories, data centres and EV charging.
State universities fall under Circular 2023/15 (30%) and the YeS-TR requirement (new education/dormitory buildings ≥10,000 m²) as public buildings; foundation universities of ≥500 TOE or ≥20,000 m² are required to have an energy manager and ISO 50001.
Expected impact of a GHP conversion in a representative 1,000-bed dormitory complex (600 kW cooling / 800 kW heating) used all year round at 85% occupancy; derived from the same set of assumptions as our residence model.
Peak electrical draw for 600 kW cooling capacity. Capacity freed up: 135 kW.
Figures are representative: Waste heat value: 1,000 beds × 85% occupancy × 365 days × 5 kWh/bed-day ≈ 1.55 GWh-heat/year (the unit-day assumption from the residence model). The result for your campus is calculated from invoices and a site survey.
Three configurations depending on the type of university:
Investment programme or EPS/ESCO model; candidate for green finance through the revolving fund enterprise.
The university or the foundation company is the borrower; a direct candidate for the VAP grant (≥500 TOE/20,000 m²) and the TSKB/TKYB–JBIC and GEFF lines.
The operating company is the borrower; phased block conversion and hot water recovery give the fastest payback.
VAP (30% of the project cost) for foundation universities and private dormitory operators; EPS/ESCO for state universities. In green finance, the JBIC lines through TSKB and TKYB (energy efficiency in scope in 2026) and the GEFF partner banks.
We support the preparation of the application file with the feasibility study, DSCR analysis and J-MRV compliant emissions calculation; for YeS-TR we share the Building Energy Performance (EKV 01) contribution analysis with the architectural team.
Preliminary savings estimate from the last 12 months of invoices per block and the usage calendar.
Which block first, which capacity; feasibility model and phased budget plan.
VAP / EPS / green loan file depending on the type of university.
Block-by-block commissioning during the summer break and between terms; student comfort uninterrupted.
Long-term maintenance; annual savings and emissions report; input for sustainable campus reports.
Scalable charging for students, staff and institutional vehicles in the campus car park: 10 points today, 40 next year — cFos dynamic load management grows with the existing transformer.
cFos charging solutions →
No; a phased, block-by-block conversion is preferable both for the budget and for operations. Each block runs independently with its own GHP group.
GHP runs at part load with modular capacity; the number of outdoor units in operation follows the load. Full capacity is available for summer school and conference periods.
The score is calculated for the building as a whole; GHP increases the score by lowering primary energy and CO₂ values in the Building Energy Performance (EKV 01) module. We carry out the contribution analysis together with the architectural team.
Send us the list of blocks, the bed/lecture hall capacity and the last 12 months of invoices; let us review together a preliminary report covering which block to start with and the expected savings.
Other solution page: GHP for Municipal and Public Buildings →