Shrink the Biggest Line in the Service Charge: GHP for Central Systems

In residences and mixed-use buildings the largest common expense is heating and cooling. Gas heat pump (GHP) technology from Aisin, a Toyota Group company, runs central HVAC on a natural-gas engine instead of electricity, and the engine's waste heat produces the central hot water. The result: lower operating costs, lower service charges and a system that loses no performance in winter.

Duru Engineering manages the whole process from one desk: feasibility, the owners' assembly presentation, green financing and turnkey installation.

No capacity loss in the coldLower service chargesFair heat-cost allocationOwners' assembly support
What It Means for Your Building

What It Means for Your Building

01

Heating built for an Ankara winter

Electric heat pumps lose capacity and efficiency at low outdoor temperatures and pause for defrost. GHP compensates with the gas engine's waste heat and keeps its capacity even on the coldest day — the decisive advantage for Central Anatolia's heating-dominated profile.

02

~90% reduction in electrical load

The summer cooling peak leaves your transformer. The freed capacity becomes a reserve for the building's future: EV charging points, electric common-area loads, new commercial units — without a transformer upgrade.

03

Free central hot water

Waste-heat recovery covers a large share of the hot-water demand of apartments and offices; the boiler gas bill shrinks.

04

Fair allocation infrastructure

Unit-level heat meters / cost allocators are part of the project: everyone pays for what they use, regulations are met and the savings show transparently in the service charge.

Representative Feasibility — 200-Unit Residence + Offices

Representative Feasibility — 200-Unit Residence + Offices

Our feasibility model for a representative building in Ankara with 200 residential units and ground-floor offices gives the following results.

TRY 814kannual operating savings (~TRY 4,000/yr service-charge relief per unit)
4.1 yearssimple payback (on the incremental investment vs. electric VRF)
1.36debt-service coverage ratio (green-loan scenario)
135 kWfreed transformer capacity

Central HVAC electrical load: before / after

Peak electrical draw for 600 kW of cooling capacity. Freed power: 135 kW.

AISIN GHP

Figures are representative: Results are based on representative assumptions; the result for your building is calculated with a bespoke model built from your common-area bills and site survey.

Who Takes the Loan? How Is the Decision Made?

Who Takes the Loan? How Is the Decision Made?

We apply one of three models depending on the ownership structure and settle the legal set-up from the start:

01

Building owned by a single company

Investor, REIT or operating company: the owner company is the borrower directly — the fastest route.

02

Condominium buildings

An owners' assembly resolution is taken under the Condominium Law and the management plan; the management/operating company authorised by that resolution becomes the borrower. We prepare the assembly presentation, with a per-unit savings table.

03

New developments

GHP is integrated into the project before sales; the developer avoids the transformer allocation cost and gains a "low service charge building" sales argument.

Let the Savings Pay for the Investment: TSKB – JBIC Green Financing

Let the Savings Pay for the Investment: TSKB – JBIC Green Financing

Credit lines extended through TSKB under the green-energy operations of the Japan Bank for International Cooperation (JBIC) finance building energy-efficiency investments.

Duru Engineering prepares your application file with the required analyses: feasibility model, DSCR analysis, sensitivity scenarios and a J-MRV-compliant emissions calculation. As long as the savings cover debt service, residents carry no extra burden; at maturity the whole saving stays in the building.

How We Work

How We Work

  1. Preliminary assessment (free)

    Preliminary savings estimate from the last 12 months of common-area electricity and gas bills.

  2. Site survey and feasibility

    Capacity assessment, Aisin model selection, feasibility model and per-unit savings table.

  3. Owners' assembly presentation

    Technical and financial briefing support for the decision process.

  4. Financing file

    Preparation of the TSKB/JBIC green loan application and process follow-up.

  5. Turnkey installation outside the heating season

    Resident information plan, hourly outage windows, a schedule planned for the season.

  6. Maintenance and reporting

    Long-term maintenance contract, allocator reading/billing support and an annual savings/emissions report.

EV charging with the freed capacity

EV charging with the freed capacity

The transformer capacity freed by GHP is the power needed for EV charging points in the building's car park. With cFos dynamic load management, every apartment can charge on the existing supply — without enlarging the transformer.

cFos charging solutions →
cFos Power Brain
Frequently Asked Questions

Frequently Asked Questions

Will heating/hot water be cut during installation?

The changeover is planned outside the heating season; the existing boiler is kept as backup until commissioning is complete, and hot-water interruptions are limited to pre-announced hourly windows.

Do the outdoor units make noise?

Placement is designed in technical spaces/roof areas away from residential façades, according to a night-time limit calculation based on the manufacturer's sound data.

Who benefits in tenanted units?

Because the saving lowers the common-expense/fuel line, it goes directly to whoever pays the service charge; thanks to the metering infrastructure, allocation is consumption-based and transparent.

Regulation and incentive note for your residential complex

  • Minimum Energy Performance Certificate (EKB) class requirement for new buildings: GHP raises the EKB class by lowering primary energy and CO₂ values.
  • Compliance with heat-cost allocation legislation: per-unit heat meter/cost allocator infrastructure is included in the project scope.
  • Owners' assembly resolution and authorised management company under the Condominium Law — we prepare the presentation for the assembly.
  • Green finance: TSKB/TKYB–JBIC lines and GEFF partner banks; eligibility depends on the borrower structure.
Regulation and incentive guide →

Per-unit savings preliminary report

Are you a building manager or owner? Send us your common-area bills for the last 12 months; we will deliver a preliminary report with the per-unit savings estimate as a first step.

Contact form →

Other solution page: GHP for Hotels →