In residences and mixed-use buildings the largest common expense is heating and cooling. Gas heat pump (GHP) technology from Aisin, a Toyota Group company, runs central HVAC on a natural-gas engine instead of electricity, and the engine's waste heat produces the central hot water. The result: lower operating costs, lower service charges and a system that loses no performance in winter.
Duru Engineering manages the whole process from one desk: feasibility, the owners' assembly presentation, green financing and turnkey installation.
Electric heat pumps lose capacity and efficiency at low outdoor temperatures and pause for defrost. GHP compensates with the gas engine's waste heat and keeps its capacity even on the coldest day — the decisive advantage for Central Anatolia's heating-dominated profile.
The summer cooling peak leaves your transformer. The freed capacity becomes a reserve for the building's future: EV charging points, electric common-area loads, new commercial units — without a transformer upgrade.
Waste-heat recovery covers a large share of the hot-water demand of apartments and offices; the boiler gas bill shrinks.
Unit-level heat meters / cost allocators are part of the project: everyone pays for what they use, regulations are met and the savings show transparently in the service charge.
Our feasibility model for a representative building in Ankara with 200 residential units and ground-floor offices gives the following results.
Peak electrical draw for 600 kW of cooling capacity. Freed power: 135 kW.
Figures are representative: Results are based on representative assumptions; the result for your building is calculated with a bespoke model built from your common-area bills and site survey.
We apply one of three models depending on the ownership structure and settle the legal set-up from the start:
Investor, REIT or operating company: the owner company is the borrower directly — the fastest route.
An owners' assembly resolution is taken under the Condominium Law and the management plan; the management/operating company authorised by that resolution becomes the borrower. We prepare the assembly presentation, with a per-unit savings table.
GHP is integrated into the project before sales; the developer avoids the transformer allocation cost and gains a "low service charge building" sales argument.
Credit lines extended through TSKB under the green-energy operations of the Japan Bank for International Cooperation (JBIC) finance building energy-efficiency investments.
Duru Engineering prepares your application file with the required analyses: feasibility model, DSCR analysis, sensitivity scenarios and a J-MRV-compliant emissions calculation. As long as the savings cover debt service, residents carry no extra burden; at maturity the whole saving stays in the building.
Preliminary savings estimate from the last 12 months of common-area electricity and gas bills.
Capacity assessment, Aisin model selection, feasibility model and per-unit savings table.
Technical and financial briefing support for the decision process.
Preparation of the TSKB/JBIC green loan application and process follow-up.
Resident information plan, hourly outage windows, a schedule planned for the season.
Long-term maintenance contract, allocator reading/billing support and an annual savings/emissions report.
The transformer capacity freed by GHP is the power needed for EV charging points in the building's car park. With cFos dynamic load management, every apartment can charge on the existing supply — without enlarging the transformer.
cFos charging solutions →
The changeover is planned outside the heating season; the existing boiler is kept as backup until commissioning is complete, and hot-water interruptions are limited to pre-announced hourly windows.
Placement is designed in technical spaces/roof areas away from residential façades, according to a night-time limit calculation based on the manufacturer's sound data.
Because the saving lowers the common-expense/fuel line, it goes directly to whoever pays the service charge; thanks to the metering infrastructure, allocation is consumption-based and transparent.
Are you a building manager or owner? Send us your common-area bills for the last 12 months; we will deliver a preliminary report with the per-unit savings estimate as a first step.
Other solution page: GHP for Hotels →