
Presidential Circular 2023/15 sets a target of at least 30% energy savings by 2030 for public buildings that are required to appoint an energy manager; from 2026, new public health, education and service buildings of 10,000 m² and above must hold a YeS-TR certificate (Turkish national green building certificate). The gas heat pump (GHP) made by Aisin, a Toyota Group company, shifts air conditioning from electricity to a natural gas engine and cuts its electricity consumption by ~90%; EC POWER cogeneration generates electricity on site in facilities that run around the clock.
Duru Engineering supports public-sector managers with a feasibility study in the ETKB (Ministry of Energy) reporting format, a J-MRV compliant emissions calculation and a file ready for the energy performance contracting (EPS/ESCO) model.
Air conditioning is the largest item in a public building's electricity consumption. With GHP, ~90% of that load moves to natural gas; the annual saving is recorded in the ENVER report in a measurable and verifiable way.
Administrations within general government cannot benefit from the VAP (Efficiency-Enhancing Project grant); the route foreseen for the public sector is the energy performance contract: the investment is repaid from savings, with no burden on the budget in the first year. Our feasibility study is built around this model.
In many public buildings the transformer capacity was fixed years ago and there is no room for EV charging or new loads. The capacity freed up by GHP is enough to electrify the institution's vehicle fleet and to charge staff vehicles — without a transformer investment.
In public buildings that run 24/7, such as hospitals, dormitories and sports facilities, EC POWER cogeneration produces electricity and hot water on site; the load on the generator and the risk of outages are reduced.
Expected impact of a GHP conversion in a representative public service building with 500 kW cooling / 400 kW heating capacity, currently air-conditioned by electric VRF (derived from the same set of assumptions as our hotel and residence models; the result for your building is calculated from invoices and a site survey).
Peak electrical draw for 500 kW cooling capacity. Capacity freed up: 112.5 kW.
Figures are representative: Results are based on representative assumptions; the result for your building is calculated with a feasibility model prepared from the last 12 months of invoices and a site survey. The model produces output in the ETKB reporting format for the Public Buildings Savings Target.
There are three routes in public procurement; we clarify together at the start of the project which one fits:
The ESCO makes the investment and the institution pays from savings; this is the model foreseen for the public sector under Law No. 5627. The feasibility study, DSCR and measurement and verification plan become annexes to the contract.
Procurement from the institution's own investment allocation; we prepare the product specification, acoustic data and layout plan for the tender's technical specification.
Application to TSKB/TKYB–JBIC and GEFF partner bank lines through a revolving fund or a municipal economic enterprise; eligibility is assessed by the bank according to the borrower structure.
The framework for public buildings is clear: 30% savings by 2030 under Circular 2023/15, with annual reporting according to the ETKB guide; an energy manager and ISO 50001 in buildings above 250 TOE or 10,000 m²; YeS-TR in new health/education/service buildings above 10,000 m². The Second National Energy Efficiency Action Plan (2024–2030) tracks buildings and services as a separate action heading.
A GHP and cogeneration conversion makes a measurable contribution under every one of these headings: savings in the ENVER report, points in the Building Energy Performance module of YeS-TR, verified reductions in the EPS contract. Duru Engineering prepares the file according to these headings.
Preliminary savings estimate from the last 12 months of electricity and gas invoices, the enclosed floor area and the usage profile.
Capacity determination, model selection, feasibility model; survey report with our EVD partners (authorised energy-efficiency consultancies).
EPS/ESCO, investment programme or green finance — technical specification, DSCR and measurement and verification plan according to the chosen route.
Planning that does not disrupt service (off-season, phased), manufacturer-certified teams.
Long-term maintenance; annual savings/emissions report in the ETKB reporting format.
The transformer capacity freed up by GHP is enough for charging infrastructure for the electrification of the institution's vehicle fleet and the staff car park. cFos dynamic load management sets up user-based, reportable charging with the existing power supply.
cFos charging solutions →
Public administrations within general government cannot apply for VAP. The route foreseen for the public sector is the energy performance contract (EPS/ESCO); municipal companies and revolving funds may additionally be candidates for green finance lines.
We prepare the product specification, technical tables, acoustic data, layout plan and feasibility summary in specification language; it can be defined by performance criteria rather than by brand name.
The conversion is planned in phases (by block/floor) and off-season; the existing system remains on standby until commissioning is complete.
Send us your building's last 12 months of invoices and its enclosed floor area; let us review together a preliminary report covering the contribution to the 2030 target and the appropriate financing route.
Other solution page: GHP for Hotels →