Energy is the largest operating cost in hotels after staff — and at the heart of it lie air conditioning and hot water. Gas heat pump (GHP) technology from Aisin, a Toyota Group company, cools and heats with natural gas instead of electricity, while the engine's waste heat warms your pool and domestic hot water for free.
As Aisin GHP's representative in Turkey, Duru Engineering manages the whole process turnkey: from feasibility to green financing, from off-season installation to long-term maintenance.
In a GHP the compressor is driven by a natural-gas engine, not an electric motor. Your transformer relaxes at the summer cooling peak; capacity upgrades, demand charges and generator investments drop off the agenda.
The gas engine's waste heat is recovered and covers a large share of the hotel's hot-water demand. The boiler gas you burn separately for pool, spa and domestic water largely disappears.
Taking HVAC off the electrical load creates a capacity reserve for EV charging points in the guest car park or new electric kitchen/event loads — without a new transformer.
Greenhouse-gas reduction is documented with an internationally standard measurement-reporting-verification (MRV) approach; direct input for Sustainable Tourism Programme certification and tour operators' sustainability requirements.
Our representative feasibility model for a 300-room Mediterranean hotel running at 70% average annual occupancy gives the following results. Savings stay positive even if price and efficiency assumptions deviate 20% against the project.
Peak electrical draw for 500 kW of cooling capacity. Freed power: 112.5 kW.
Figures are representative: Results are based on representative assumptions; the result for your hotel is calculated with a bespoke model built from your bills and site survey.
Credit lines extended in Turkey through TSKB under the green-energy operations of the Japan Bank for International Cooperation (JBIC) finance energy-efficiency investments. GHP projects with Japanese technology are natural candidates.
Duru Engineering prepares your loan application file with the required analyses: feasibility model, debt-service coverage (DSCR) analysis, sensitivity scenarios and a J-MRV-compliant greenhouse-gas reduction calculation. The goal is simple: let your verified energy savings, not your equity, repay the investment.
Preliminary savings estimate from your last 12 months of electricity and gas bills and facility data.
Capacity assessment, Aisin model selection, feasibility model and sensitivity analysis.
Preparation of the TSKB/JBIC green loan application and follow-up of the bank process.
Manufacturer-certified teams, a schedule planned for season opening.
Performance assurance under a long-term maintenance contract and an annual J-MRV savings/emissions report.
The transformer capacity freed by the GHP conversion is exactly the power a charging infrastructure for the guest car park needs: one project cuts energy costs and brings charging to the car park — without enlarging the transformer.
cFos charging solutions →
Both are possible. Phased conversion (one block/section first) is common; the existing boiler can stay in the system as backup.
GHP uses an Aisin gas engine with automotive reliability; periodic maintenance (oil, spark plugs etc.) is carried out on schedule under our maintenance contract, and its cost is included in the feasibility from the start.
Outdoor units are placed in technical areas away from room façades according to a noise calculation based on the manufacturer's sound data; the layout plan is part of the proposal.
Send us your hotel's electricity and gas bills for the last 12 months; we will deliver your free preliminary savings estimate as a first step.
Other solution page: GHP for Residences & Offices →