Home AISIN GHP EC POWER cFos eMobility
Solutions ▾
Experience About Us Contact Members
AISIN
Toyota (AISIN) GHP for Hotels

Turn Your Hotel's Second-Largest Cost Line into Profit

Energy is the largest operating cost in hotels after staff — and at the heart of it lie air conditioning and hot water. Gas heat pump (GHP) technology from Aisin, a Toyota Group company, cools and heats with natural gas instead of electricity, while the engine's waste heat warms your pool and domestic hot water for free.

As Aisin GHP's representative in Turkey, Duru Engineering manages the whole process turnkey: from feasibility to green financing, from off-season installation to long-term maintenance.

~90% less electrical loadFree hot waterTSKB–JBIC green loanOff-season turnkey installation
What It Means for Your Hotel

What It Means for Your Hotel

01

~90% reduction in electrical load

In a GHP the compressor is driven by a natural-gas engine, not an electric motor. Your transformer relaxes at the summer cooling peak; capacity upgrades, demand charges and generator investments drop off the agenda.

02

Free hot water

The gas engine's waste heat is recovered and covers a large share of the hotel's hot-water demand. The boiler gas you burn separately for pool, spa and domestic water largely disappears.

03

Freed transformer capacity

Taking HVAC off the electrical load creates a capacity reserve for EV charging points in the guest car park or new electric kitchen/event loads — without a new transformer.

04

A measurable sustainability contribution

Greenhouse-gas reduction is documented with an internationally standard measurement-reporting-verification (MRV) approach; direct input for Sustainable Tourism Programme certification and tour operators' sustainability requirements.

Representative Feasibility — 300-Room Coastal Hotel

Representative Feasibility — 300-Room Coastal Hotel

Our representative feasibility model for a 300-room Mediterranean hotel running at 70% average annual occupancy gives the following results. Savings stay positive even if price and efficiency assumptions deviate 20% against the project.

TRY 720kannual operating savings
4.7 yearssimple payback (on the incremental investment vs. electric VRF)
49%equity IRR (with green loan)
~62 t CO₂/yrgreenhouse-gas reduction

HVAC electrical load: before / after

Peak electrical draw for 500 kW of cooling capacity. Freed power: 112.5 kW.

AISIN GHP

Figures are representative: Results are based on representative assumptions; the result for your hotel is calculated with a bespoke model built from your bills and site survey.

Let the Savings Pay for the Investment: TSKB – JBIC Green Financing

Let the Savings Pay for the Investment: TSKB – JBIC Green Financing

Credit lines extended in Turkey through TSKB under the green-energy operations of the Japan Bank for International Cooperation (JBIC) finance energy-efficiency investments. GHP projects with Japanese technology are natural candidates.

Duru Engineering prepares your loan application file with the required analyses: feasibility model, debt-service coverage (DSCR) analysis, sensitivity scenarios and a J-MRV-compliant greenhouse-gas reduction calculation. The goal is simple: let your verified energy savings, not your equity, repay the investment.

How We Work

How We Work

  1. Preliminary assessment (free)

    Preliminary savings estimate from your last 12 months of electricity and gas bills and facility data.

  2. Site survey and feasibility

    Capacity assessment, Aisin model selection, feasibility model and sensitivity analysis.

  3. Financing file

    Preparation of the TSKB/JBIC green loan application and follow-up of the bank process.

  4. Off-season turnkey installation

    Manufacturer-certified teams, a schedule planned for season opening.

  5. Maintenance and reporting

    Performance assurance under a long-term maintenance contract and an annual J-MRV savings/emissions report.

EV charging with the freed capacity

EV charging with the freed capacity

The transformer capacity freed by the GHP conversion is exactly the power a charging infrastructure for the guest car park needs: one project cuts energy costs and brings charging to the car park — without enlarging the transformer.

cFos charging solutions →
cFos Power Brain
Frequently Asked Questions

Frequently Asked Questions

Does GHP replace our existing system or run alongside it?

Both are possible. Phased conversion (one block/section first) is common; the existing boiler can stay in the system as backup.

Is gas-engine maintenance a burden?

GHP uses an Aisin gas engine with automotive reliability; periodic maintenance (oil, spark plugs etc.) is carried out on schedule under our maintenance contract, and its cost is included in the feasibility from the start.

Will noise disturb guests?

Outdoor units are placed in technical areas away from room façades according to a noise calculation based on the manufacturer's sound data; the layout plan is part of the proposal.

Regulation and incentive note for your hotel

  • Hotels at ≥500 TOE or ≥20,000 m² must appoint an energy manager and set up ISO 50001; a GHP conversion enters your ENVER report as a measurable project.
  • VAP grant: 30% of project cost (2026 cap ~27 million TL) — hotels are eligible; application file prepared with our EVD (authorised energy-efficiency consultancy) partners.
  • MRV-documented CO₂ reduction for Sustainable Tourism Programme certification; visibility in the context of COP31 (Antalya, November 2026).
  • Green finance: JBIC lines via TSKB and TKYB (development banks); EBRD GEFF partner banks (tourism in scope).
Regulation and incentive guide →

Free preliminary savings estimate

Send us your hotel's electricity and gas bills for the last 12 months; we will deliver your free preliminary savings estimate as a first step.

Contact form →

Other solution page: GHP for Residences & Offices →