Two things cannot be done in a listed building: hanging air-conditioner outdoor units on the facade and cutting ducts through the ceiling. The electrical infrastructure is also usually old and limited. The gas heat pump made by Aisin, a Toyota Group company, is suited to exactly these constraints: a small number of outdoor units are concealed in the courtyard or a technical area, inside the building small-bore refrigerant pipes run through existing shafts, no ducts are needed and the system can be removed — in line with the principle of reversible intervention. Because the electrical load falls by ~90%, the old transformer remains sufficient without reinforcement.
For museums, libraries, foundation monuments, restored mansion and caravanserai hotels, governorate and municipal buildings and historic university campuses, Duru Engineering offers design suited to the Koruma Bölge Kurulu (Regional Conservation Board)/KUDEB approval process, coordination with the restoration architect and turnkey installation.
Instead of individual air conditioners, a small number of GHP outdoor units: courtyard, garden, plant room or a hidden flat roof area. Placement based on acoustic data, with an acoustic screen included in the design where needed.
VRF indoor units (concealed ceiling, cassette, wall) are fed by small-bore copper pipes; existing shafts and floor voids are used, the original ceiling and wall fabric is preserved.
The system makes no permanent intervention in the structure; it leaves no trace when removed. Compliance with the reversibility principle of conservation legislation is documented in the report.
Reinforcing a transformer in a historic district is difficult and costly; with GHP the electrical load of air conditioning falls by ~90% and the existing supply is enough. As there is no capacity loss in cold weather, the heating load of a thick-walled, uninsulated building is met; waste heat goes to domestic hot water.
Expected impact of an air-conditioning and hot water conversion with 2 × 20 HP GHP in a representative listed, restored 40-room mansion hotel; scaled from the set of assumptions of our hotel model.
Peak electrical draw for 140 kW cooling capacity. Capacity freed up: 31.5 kW.
Figures are representative: Peak electrical draw for 140 kW cooling capacity; ~35 kW with electric VRF, ~3.5 kW with GHP. The result for your building is calculated from the measured survey and a site study.
Depending on the listing grade and ownership:
The mechanical services design is submitted as an annex to the restoration project; outdoor unit placement, pipe routing and the reversibility report are in the file. Board practice varies by region; we manage the process together with the restoration architect.
Approval from the Directorate General of Foundations or the relevant institution; if it is a public building, Circular 2023/15 (30% savings) also applies.
The owner or the operator is the borrower; for a hotel, candidacy for VAP and green finance and a contribution to the Sustainable Tourism Programme.
Listed buildings may be exempt from the Energy Performance Certificate requirement, but those exceeding the 250/500 TOE or 10,000/20,000 m² thresholds are subject to the energy manager obligation; those in public ownership are subject to the 30% target. The existing-building version of YeS-TR and BREEAM In-Use can also be applied to a historic building.
Finance: if the operator is in the private sector, VAP (30% grant) and the TSKB/TKYB–JBIC and GEFF lines; if public, EPS/ESCO. We prepare the file according to the restoration project's timetable.
Preliminary estimate of capacity and layout from the existing measured survey/restoration project and the last 12 months of invoices.
Outdoor unit placement, pipe routing (shafts, floor voids), indoor unit types; reversibility and acoustic report.
Integration of the mechanical design and reports into the restoration file; coordination with the architect.
Installation in parallel with the building works, with no contact with the original fabric; certified teams.
Long-term maintenance; annual savings/emissions report.
While reinforcing a transformer in a historic district is difficult, the capacity freed up by GHP is enough for charging in the guest and staff car park; cFos dynamic load management works with the existing supply.
cFos charging solutions →
Practice varies from board to board; the principle is that it must not be visible from the facade and must be reversible. Files prepared with courtyard/technical area placement and an acoustic screen generally meet these principles. We manage the process together with the restoration architect.
GHP does not lose capacity at low outdoor temperatures; it is suited to the high heating load of an uninsulated building. The capacity is determined from the measured survey and a heat loss calculation.
As there are no ducts, the ceiling is not cut; indoor units are installed as concealed ceiling or wall-mounted types, with pipes routed through existing shafts. Every point of intervention is marked on the design.
Send us the measured survey/restoration project, the listing details and the last 12 months of invoices; let us review together a layout proposal suited to the Board file and a preliminary savings estimate.