Home AISIN GHP EC POWER cFos eMobility
Solutions ▾
Experience About Us Contact Members
AISIN
EC POWER cogeneration and Toyota (AISIN) GHP for hospitals

A Hospital Never Stops: Generate Electricity and Hot Water On Site

A hospital is the only building type that demands electricity, hot water and air conditioning every hour of the year; that is why it is where cogeneration runs most efficiently. EC POWER XRGI units generate electricity from natural gas while delivering the engine heat to sterilisation, the laundry and domestic hot water; Aisin GHP runs the air conditioning on a natural gas engine instead of an electric motor, reducing the load on the transformer and the generator.

Duru Engineering manages the whole process from a single source: a feasibility study ready for the hospital energy manager's ENVER report and VAP application, the Cogeneration Efficiency Certificate process and turnkey installation.

On-site electricity + heatLower generator loadVAP: 30% grantReady for the energy manager's report
What Does It Mean for the Hospital?

What Does It Mean for the Hospital?

01

Cogeneration carries the base load

A hospital's electricity and hot water load that does not drop even at night means the XRGI runs at full load all year round: total efficiency of up to 96% from a single fuel, and a permanent reduction in electricity drawn from the grid.

02

Resilience to outages

Cogeneration can feed critical loads in island mode during a grid outage (depending on the design); the load taken on by the generator and its fuel costs are reduced.

03

Air-conditioning load moved to natural gas

The cooling and heating load of operating theatres and wards comes off the electricity supply with GHP; waste heat goes to domestic hot water. The transformer is relieved at the summer peak.

04

Regulation and grants

Hospitals of ≥500 TOE or ≥20,000 m² are required to have an energy manager and ISO 50001; a GHP/CHP project can receive a VAP grant of up to 30% of the project cost (subject to the Efficiency Certificate for cogeneration).

Representative Scenario — 200-Bed Hospital

Representative Scenario — 200-Bed Hospital

Expected impact of 2 × XRGI 20 cogeneration units and a GHP air-conditioning conversion in a representative 200-bed hospital operating 24/7. Values are derived from EC POWER factory data and the assumptions of our GHP models; the result for your hospital is calculated from its load profile and invoices.

40 kWe / 84 kWth2 × XRGI 20: electrical and thermal output
~300,000 kWhannual on-site electricity generation (7,500 hours)
~90%reduction in the electrical load of air conditioning (GHP)
Up to 30%VAP grant (of the project cost)

Electrical load of air conditioning: before / after

Peak electrical draw for 500 kW cooling capacity; the 40 kWe generated by cogeneration comes on top of this.

AISIN GHP

Figures are representative: The cogeneration output value is calculated from XRGI 20 factory data (20 kWe, 42 kWth) × 7,500 hours/year. The savings amount varies with the tariff; you can also obtain a preliminary figure yourself with our CHP savings calculator.

Cogeneration, GHP, or Both?

Cogeneration, GHP, or Both?

Three configurations depending on the hospital's load profile:

01

Cogeneration only

If the hot water and base electrical load are high and the existing air conditioning is new: XRGI units are sized to the heat demand, electricity becomes a by-product.

02

GHP only

If the air-handling plant is due for replacement: air conditioning moves to natural gas, waste heat to domestic hot water; transformer capacity is freed up.

03

GHP + cogeneration

The highest savings in large hospitals: cogeneration takes the base load, GHP takes the air conditioning; integrated in a single hydraulic scheme.

Let Savings Pay for the Investment: Grants and Green Finance

Let Savings Pay for the Investment: Grants and Green Finance

Private hospitals can apply for VAP (30% of the project cost, 2026 cap ~TRY 27 million; survey and file with our EVD partners). For public hospitals the route is the EPS/ESCO model. In both cases, an ETKB Efficiency Certificate is obtained for cogeneration; units of ≤100 kWe are exempt from licensing.

For green finance, the JBIC lines through TSKB and TKYB and the GEFF partner banks are candidates; we support the preparation of the application file (feasibility, DSCR, J-MRV emissions calculation).

How We Work

How We Work

  1. Load profile analysis (free preliminary assessment)

    Preliminary estimate of cogeneration size and GHP capacity from the last 12 months of electricity and gas invoices, the number of beds and hot water consumption.

  2. Site survey and feasibility

    Hydraulic integration, island mode requirement, model selection, feasibility model, sensitivity analysis.

  3. Efficiency Certificate and grant/finance file

    Cogeneration Efficiency Certificate application; VAP or EPS file; green loan application where needed.

  4. Installation without interrupting service

    Phased commissioning, existing system on standby; certified teams.

  5. Maintenance and reporting

    Long-term maintenance; annual savings, generation and emissions report.

EV charging with the freed capacity

EV charging with the freed capacity

The capacity freed up by GHP is enough for staff, ambulance and visitor charging in the hospital car park; cFos dynamic load management always gives priority to critical loads.

cFos charging solutions →
cFos Power Brain
Frequently Asked Questions

Frequently Asked Questions

Does cogeneration replace the generator?

No; the emergency generator remains, as required by regulation. In normal operation, cogeneration reduces the electricity drawn from the grid and, depending on the design, feeds critical loads during an outage, reducing the generator's run time and fuel.

Noise and vibration?

XRGI units have enclosed acoustic cabinets and are installed in the plant room; GHP outdoor units are placed in technical areas away from patient rooms, using the manufacturer's acoustic data.

Installation risk in sterile areas?

Installation is planned area by area, in coordination with the infection control committee; hydraulic connections are made in the plant room and service areas are not entered.

Regulatory and incentive note for your hospital

  • Hospitals of ≥500 TOE or ≥20,000 m²: energy manager, ISO 50001, energy audit every 7 years.
  • VAP: grant of 30% of the project cost (2026 cap ~TRY 27 million); ETKB Efficiency Certificate required for cogeneration.
  • Micro-cogeneration of ≤100 kWe is exempt from licensing and company formation.
  • Green finance: TSKB/TKYB–JBIC lines, GEFF partner banks.
Regulation and incentives guide →

Let us calculate your hospital's base load

Send us the last 12 months of electricity and gas invoices, the number of beds and hourly consumption data if available; let us review together a preliminary report covering the cogeneration size and the GHP impact.

Contact form →

Other solution page: GHP for Municipal and Public Buildings →