Home AISIN GHP EC POWER cFos eMobility
Solutions ▾
Experience About Us Contact Members
AISIN
EC POWER cogeneration and Toyota (AISIN) GHP for swimming pools and sports facilities

A Pool Is Cogeneration's Best Customer: No Heat Ever Goes to Waste

A semi-Olympic pool needs heat every day of the year to keep the water at 27–28 °C, feed the showers and deal with humid air. Cogeneration's only weak point — heat that cannot be used — disappears in a pool: the EC POWER XRGI delivers its engine heat to the pool water and shower water while generating electricity on site. Aisin GHP, in turn, runs the air conditioning of the sports hall and social areas on a natural gas engine.

For municipal sports complexes, university pools, hotel spas and private sports facilities, Duru Engineering builds the feasibility study from the pool's actual heat balance and prepares the VAP and EPS/ESCO file.

Constant year-round heat loadPool + showers + dehumidificationOn-site electricityMunicipal/university facility
What Does It Mean for the Facility Operator?

What Does It Mean for the Facility Operator?

01

Every kWh of heat is used

The pool water, showers and dehumidification unit consume all of the cogeneration heat all year round; the unit runs at full load and high efficiency. An XRGI sized to the heat demand largely replaces the boiler's gas consumption.

02

A smaller electricity bill

The load of pumps, filtration, lighting and dehumidification is met by electricity generated on site; grid purchases fall and the demand charge risk is lower.

03

Cooling and humidity control with GHP

The cooling load of the sports hall, fitness and social areas moves to natural gas with GHP; waste heat adds a further contribution to shower water.

04

Separate routes for public and private

Municipal facilities fall under Circular 2023/15 (30%) and suit the EPS/ESCO model; private facilities are candidates for the VAP grant (30%).

Representative Scenario — Sports Complex with a Semi-Olympic Pool

Representative Scenario — Sports Complex with a Semi-Olympic Pool

Expected impact of 1 × XRGI 20 cogeneration unit and GHP air conditioning in a representative facility with a 25 m semi-Olympic pool, showers and 2,000 m² of sports areas. Values are derived from EC POWER factory data; the result for your facility is calculated from the pool's heat balance and invoices.

20 kWe / 42 kWthXRGI 20: electrical and thermal output
~150,000 kWhannual on-site electricity (7,500 hours)
~315,000 kWhannual heat — to pool and shower water
Up to 96%total fuel efficiency

Electrical load of sports area air conditioning: before / after

Peak electrical draw for 300 kW cooling capacity. Capacity freed up: 67.5 kW.

AISIN GHP

Figures are representative: Output values: XRGI 20 factory data × 7,500 hours/year. The heat load varies with the pool surface, air temperature and usage intensity; the feasibility study establishes the pool's actual heat balance. You can also obtain a preliminary figure yourself with our CHP savings calculator.

Which Configuration?

Which Configuration?

Depending on the structure of the facility:

01

Indoor pool + showers

Cogeneration only: 1–2 XRGI units sized to the heat demand, the existing boiler for peak and backup.

02

Pool + sports hall + social areas

Cogeneration + GHP: heat to the pool, air conditioning to GHP; a single hydraulic scheme.

03

Hotel spa / seasonal outdoor pool

A small XRGI and GHP sized to the seasonal profile; low profile in winter, full load in summer.

Let Savings Pay for the Investment: Grants and Finance

Let Savings Pay for the Investment: Grants and Finance

Private facilities are candidates for VAP (30% of the project cost, Efficiency Certificate for cogeneration); EPS/ESCO for municipal facilities. Micro-cogeneration of ≤100 kWe is exempt from licensing.

In green finance, the TSKB/TKYB–JBIC lines and the GEFF partner banks; we prepare the application file with the feasibility study, DSCR and emissions calculation.

How We Work

How We Work

  1. Heat balance and preliminary assessment (free of charge)

    Pool dimensions, operating hours, last 12 months of invoices → cogeneration size and preliminary savings.

  2. Site survey and feasibility

    Hydraulic integration (pool heat exchanger, shower water tanks), model selection, feasibility model.

  3. Efficiency Certificate and grant/finance file

    Cogeneration Efficiency Certificate; VAP or EPS file; green loan where needed.

  4. Off-season installation

    Commissioning during the maintenance closure; existing boiler on standby.

  5. Maintenance and reporting

    Long-term maintenance; annual generation, savings and emissions report.

EV charging with the freed capacity

EV charging with the freed capacity

Member and visitor charging in the sports complex car park: the electricity generated by cogeneration and the capacity freed up by GHP are directed to the charging points with cFos load management.

cFos charging solutions →
cFos Power Brain
Frequently Asked Questions

Frequently Asked Questions

Does cogeneration run in summer too?

Pool and shower water need heat in summer as well; in an indoor pool the load is continuous all year round. For an outdoor pool it is sized to the seasonal profile.

Integration with the dehumidification unit?

The heating coil of the dehumidification unit is fed from the cogeneration heat; it is designed as a separate circuit in the hydraulic scheme.

What happens to the existing boiler?

It remains for peak and backup; cogeneration takes the base load, the boiler takes the peaks. This keeps the investment small and the efficiency high.

Regulatory and incentive note for your facility

  • Municipal facilities: Circular 2023/15 (30%), EPS/ESCO model.
  • Private facilities: VAP 30% grant; Efficiency Certificate for cogeneration; ≤100 kWe licence exemption.
  • Energy manager and ISO 50001 in facilities above the thresholds.
  • Green finance: TSKB/TKYB–JBIC, GEFF.
Regulation and incentives guide →

Let us establish your pool's heat balance

Send us the pool dimensions, operating hours and the last 12 months of invoices; let us review together a preliminary report covering the cogeneration size and the expected savings.

Contact form →

Other solution page: GHP for Universities and Campuses →